Mold Product
Order Process Flow

Mold Product Design is based on the drawings or samples provided by the customer and in accordance with the customer's requirements to design a reasonable mold plan.

1

Confirm The Order & Pay A Deposit

Used mold is cheap and competitive so after the customer chooses the design and signs the contract, they need a 30% deposit to keep the mold and proceed with it.

2

Testing

Mold testing: Complete all mold tests within 3 days to ensure normal production. Shoot videos and save samples; Sample inspection: Check carefully after testing to ensure there are no defects; Assembly verification: Use test samples to assemble and verify product matching.

3

Mould quality inspection

Open the mould to check if there is any rust, clean or polish the rusty mould and spray anti-rust agent.

4

Renew

For the mold, we will check the water if any leaking and change the water mouth, also print it, and rape it with plastic film.

5

Packing

Use a 15mm wooden case to pack it easy for customer loading

6

Delivery

When the inspection result is OK and the customer confirms that it can be shipped, we will send the product to the customer.

Taizhou Huangyan Edge Mould Co., Ltd.

Supply System

1. Raw material supplier - choose regular companies for long-term cooperation, the steel materials are genuine and not fake, and the material list contract certificate can be provided after the mold order is placed. Hot runner system - the hot runner company designs and manufactures it by itself, heating is fast and stable, and the quality is strictly controlled
2. Selection of mold accessories
3. Mold shape design The company has its own design department personnel specializing in mold design, which is convenient for mold production and processing.
4. Processing process: Own processing design such as CNC milling, milling machine, grinder and injection molding machine, from the beginning of the mold, from raw material processing to molding trial mold, it can basically be completed within the company, which can better control the processing quality and speed. The company is equipped with 2 Taiyi De, 1 Huamei Da injection molding machine and manipulator, and it will be shipped after normal production for several hours before shipment.

Taizhou Huangyan Edge Mould Co., Ltd.

Process control system

1. After receiving customer inquiries or orders, confirm the sample material, size, weight, and requirements, provide customers with accurate mold size and suitable injection molding machine size, and seal the customer as is.
2. After the mold order is placed, the design team will design the mold according to customer requirements, and implement the material cutting after confirming the design with the customer.
3. During the mold manufacturing process, a special team will track the mold progress and any details to ask him, the team will collaborate and communicate, and update the mold progress chart to the customer promptly.
4. During the mold trial, take a video, record the problem points, and keep and compare the samples of each mold trial to facilitate sending samples and modifications to customers.
5. After the mold is finally tested, the last mold trial is produced in the factory for 2 hours to ensure that the mold is produced normally before delivery. The mold surface is oiled, wrapped with plastic wrap, and shipped in export wooden boxes. Record the mold size, packaging size, and actual weight, make a nameplate, affix the mark and the packing list, and load and ship with a forklift when shipped.

Taizhou Huangyan Edge Mould Co., Ltd.

QC Quality Inspection System

1. Check whether the inner and outer surfaces of the mold are stained during each mold trial, check the polishing finish of the mold, and check whether the mold sample is deformed, or has flash, top white, or burn marks. Check whether the assembly is appropriate when assembling the sample, and check whether it can be stacked normally if there is a stacking requirement.
2. For products with water sealing requirements, after the mold trial, the product is cooled and filled with water, one group of products is inverted and one group of products is 45°. After 48 hours, check whether there is water leakage.
3. Check the final sample size and modeling product, and check whether the size and weight of the mold sample are consistent with the actual original sample.
4. Check the mold waterway before shipment, whether the accessories have been fully installed, and purchase 20% of the additional accessories pack them in a wooden box with the mold, and give them to customers together.

Service system

Before the mold is shipped

Provide mold instructions

Overseas mold debugging service

Mold repair

After-sales service

1. Before the mold is officially shipped, the final mold test is carried out and the video record of the mold test process is kept.
2. The parameters and videos of the mold test are sent to the customer to ensure that the customer understands the actual performance and operation process of the mold.
3. If the mold has special maintenance requirements, it is necessary to explain to the customer in advance to ensure that the customer can correctly and effectively perform the mold maintenance work.

1. Each mold will be accompanied by a detailed instruction manual before shipment.
2. The size of each part will be indicated in the instruction manual to facilitate the customer to replace or repair the parts.
3. Each board involved in the mold design will be printed out and provided to the customer together with the instruction manual to help the customer better understand the structure and design of the mold.

1. If the customer needs it, the company can provide overseas mold debugging services.
2. The customer needs to bear the cost of accommodation and air tickets for the debugging personnel, as well as a salary of 500 yuan per day.
3. The company will send professional mold debugging personnel to the customer's location to assist the customer in debugging the mold.

1. According to the mold life stipulated in the contract, during normal production, if there is a major problem with the mold, the customer has the right to ship the mold back to the company for free repair.
2. The beryllium copper material purchased by the company enjoys a 5 million warranty to ensure the quality and reliability of the material.

1. After the mold is sold, the company has a dedicated after-sales staff responsible for keeping in touch with the customer.
2. The after-sales staff will ask the customer by phone whether they encountered any problems during the production process and collect customer opinions and suggestions.
3. In this way, the company can keep abreast of customer needs and feedback and continuously optimize products and services.